Busy Building

Saturday we poured ahead on getting ready for the next flights.  Four vehicle are being prepared for March 31st. This will be our annual thousand PongSat mission.

In addition to over a thousand PongSats we will be conducting helium valving tests. live video camera control and a pile of other tests for Tandem and ATO.

Paul and Julian cutting fabric for a balloon slider panel.

Anthony mounting main controller parts.

PongSat Racks!

2 Responses to “Busy Building”

  1. CaptainFailmore says:

    “In addition to over a thousand PongSats we will be conducting helium valving testes…”

    Um.

  2. Administrator says:

    oops! fixed.