We had a huge build session Saturday. The Away mission high racks make a big leap forward.
Among the things accomplished:
Three GPS tracking Telemetry systems were completed and tested.
Three housing for the backup mini beacons were make and the mini beacon installed.
Main structure backup lines were installed on all three high racks.
The last of the ground stake loops were sewn on to the new launch bag.
A balloon release controller board was soldered together and a hosing make for it.
We even repaired a broken truss pole on Tandem and stopped to eat pizza and watch ourselves on National Geographic.. Way to go team!
![]()