We’ve finished the remote trigger for the RF portion of the quad engine. The next step is making the mounts for the magnets.
We’ve also finished cutting out the fabric for the two 50 foot air beams (main and backup). The tricky part was marking them. Drawing eight, fifty-four foot long straight lines on an amazingly slippery lightweight fabric is a chore. Now on to hemming and joining. I can just feel the excitement of the team building, “Oh boy more sewing!”.
Why not use a line laser to display a line on the fabric while it’s laid out? Then use a marker to just “dot” the fabric along the line.
If sewing is how we get to orbit, let me at it. Wait. Am I gullible? Or, do I have a secret plan? Well, I guess I’ll just find out later.