Away 43 Landing Site
May 31st, 2010Mars Explorers
May 31st, 2010Quad Engine Work
May 26th, 2010The quad engine is getting closer and closer to firing. The oxidizer plumbing is done. We did a cold flow test at 100 psi. It turns on and off just like it should from the remote control box. We also modified our Hypertech ignition system for the quad. Lastly we’ve mounted the whole thing on tracks.
Next the instrumentation needs to be added so we’ll know what’s going on. Then the entire system will get mounted on a cart to make setup in the desert easier.
PongSats the Movie
May 24th, 2010[wp_youtube]2sQCAZu33VY[/wp_youtube]
Latest Build Session
May 24th, 2010Saturday was a day of sewing, circuits and foam cutting. We need a little more power output from the new propeller driven balloon release (propeller as in the chip). Mike spent the day bread boarding the modification circuit. Paul was busy at the sewing machine creating a wider tear panel for our small balloon bag. The balloon bag is just the right size for sea level launches but too small for launches the 4000 foot Black Rock lake bed. The wider tear panel will add just the right amount of room. Ethan our evil intern wrestled with triangles all day making antenna mounts for the next set of vehicles (the triangles almost had him, but he won out in the end).









The JPA Store