Away 129 Prep for Launch

Working the checklist. Away 129 had 75 tasks on the checklist. It was one of our more complex high racks with 4 separate telemetry systems, 5 cameras, data logger, full array of sensors, beacon, in house and student experiments and our standard flight system set.

Final prep before launch. Now we’re down to things like foreign object removal, rigging inspection, balloon sep system power up. Then it’s the final ‘GOs’ from mission control, videographer, traffic, and balloon team.

Comments are closed.