Ascender 9 Assembly Test

We conducted a full assembly test of the Ascender 9 airship. In this test the inner envelope divider walls were installed along with the inner lifting cells, the upper decks, and all the valves, vents, pumps and helium plumbing. This test took about four hours. Everything went great and give us a big list of todo’s before the next test.