The Latest

We’ve been packaging up the quad engine.  There is an awful lot of cables, boxes and plumping on this engine.  It would take too long to set all this up in the desert so the whole things is getting bolted down on a set of shelves.  We want to do the first fire test on our next mission.

The TV commercial for last week didn’t go through but two TV missions have popped up on the horizon. Both are about nine to twelve months out.

We are weighing and  juggling missions right now. Tandem needs one more piece of gear flight tested before it can go. We can do that in conjunction with the rocket launch flight or set up a quick half rack quick flight to take care of it. We’re looking at the dollars and the weather for the decision.

Comments are closed.