Last night we continued sewing frame sleeves on the Ascender 26. The team also repackaged our main flight controller into the Ascender 26 configuration. We did two shock tube firings, both at mach 2.2 and lastly we flipped over the submarine in order to mount the magnetic drop weight system.
Archive for the ‘Uncategorized’ Category
Building Away
Thursday, March 27th, 2014Mach 3
Wednesday, March 26th, 2014Ascender 26
Wednesday, March 26th, 2014Shock Tube at Mach 2.4
Monday, March 17th, 2014Airship to Orbit PDF
Monday, March 10th, 2014We’ve updated the Airship to Orbit pdf. On our website we have an brief overview of Airship to Orbit. It covers the basic idea, some diagrams of the orbital airship and pictures of project milestones. It was getting a little out of date so we gave it an overhaul. Check it out!




The JPA Store