  • More Chair on the Edge

    The folks at Grey London (the producers of the Toshiba Space Chair Commercial) just sent word they posted another video of JPA on YouTube. It’s more behind scenes of the chair launch and recovery. Did I really look that tired?

    [wp_youtube]TK4S2XkcmJo[/wp_youtube]

  • Glue Flying and Sewing Machines Rumbling

    We’ve had a some intense build sessions the last couple of weeks. Big crowds of team member building like mad. We’re attempting five flights and two motor firings on our next trek to the desert. It’s a huge pile of work, and the team has risen to the occasion. Remember, no work, no Kirk.

    paulandtearpanel evil_intern

    Paul is about to sew on the last panel of the new balloon launch bag. Ethan is doing his evil intern impression.

    making_conectors feetinspace

    Each vehicle uses about 20 customs cables and harness, (with 5 vehicle that’s a lot),  here’s Bob cranking out a pile of them.  Those look suspiciously like JP’s feet hiding in the crew module mock up.

  • PongSat Flight Opportunity

    Away 44, 45 and 46 will be carrying PongSats aloft on April 24th 2010.

    If you want to be on board send me an email with your contact info and how many PongSats you want to fly. I’ll send you ID numbers to write on your PongSats. You will need to send your PongSats to us at least a week before the flight. Important Note: Spring missions often get delayed for weather. Our rain alternate date is May 8th.

    Away 44 and 45 missions are single balloon flights to 100,000 feet.  Away 46 is set to go higher, around 120,000 feet. Space is limited on Away 46 to five PongSats so let me know early if you want on board that one. There is plenty of space on 44 and 45 for lots of PongSats. Everyone is welcome to fly.

    JP

  • Mock Up in One Minute

    [wp_youtube]BQFR6XFnMdE[/wp_youtube]

  • Air Beams for Jellyfish

    Our new Jellyfish balloon uses inflated struts.  They don’t have an outer shell so there not true air beams.  However, they are beams and full of air. Last night we tested the maximum pressure the unsupported tubes could  take. The answer ended up being very complicated.  The beam held fine at 1.1 psi then bubbled,  stretched and burst as the pressure dropped down to 0.7 psi. We retested varying the pressure between  0.5 and 0.7  for 30 minutes, (est. first flight duration). It held just fine showing no stain.  The beam need to hold 0.4 for the structural needs of the balloon. In flight the pressure will be monitored and controlled and now we know to keep the max pressure at or below 0.7 psi. Even a brief spike at higher pressure creates failures in the plastic matrix. Once that happens the beam is toast even at much lower pressures.

    jellybeam1 jellybeam2

    jellybeam3 jellybeam4

  • 300 Watts

    Today we drove the plasma side of the “desktop” quad engine to 300 watt. No components melted, nothing caught on fire, and it even generated plasma.  Points ahead!

    We won’t fire the hybrid side of the engine until we’re out in a remote area. There is still a lot of plumbing to be built first though.

  • Altimeter for the Pup

    We got an altimeter for the Sky Pup. I may be a wimp, but I can’t fly without one.  The Pup has a GPS on board however the GPS response rate for altitude is a little slow. We’re using a MicroTim Digital altimeter. It’s a very nice instrument and fairly low cost.

    microtim

  • Pics from the Past

    Here’s a shot from up top. This is an on board view from our 2004 Away 25 mission.

    away25stillclimbing

    You can see a whole pile of PongSats going up in the 2006 Away 30 mission.

    away30

  • Handles and More Sewing

    Saturday the team really got some work done. First we cut out handles and mounted them on the crew module mockup. This allows us to easily lift it on and off of the interior. Before putting it over the chair assemble they had to do a fair bit of rearranging of the shop.

    We bumped to telemetry system work to next week, but did get three more balloon bag panels sew together, the popper/propeller circurt further along and the two more test antennas for the quad engine soldered together.

    Mounting Handles Trimming Hatch Frame

    Mockup Couchs mockup_inside1

    trimming_hatch inside_people

    mockup_crew_module

  • Today’s ToDo

    Here’s the list for today’s build session:

    -Mount handles on crew module mockup, (six handles mounted on the exterior so we can lift the thing).
    -Assemble the propeller popper, (upgraded backup balloon separation circuit use the Parallax Propeller chip).
    -Join launch bag panels, (each of the 28 foot panels need to be sewn to each other).
    -Assemble 3 backup trackers, (we’re rebuilding all of out backup tracking telemetry systems).