What’s Happening at JPA

  • Blog changes

    The blog was hacked big time. About 20 pages of hidden links to pharmacy companies were embedded in the background and headers. We’ll be making changes and doing upgrades over the next few days. You may notice some changes as we work through it all.

  • Building for the Edge of Space

    We had a huge build session Saturday. The Away mission high racks make a big leap forward.

    Among the things accomplished:

    Three GPS tracking Telemetry systems were completed and tested.
    Three housing for the backup mini beacons were make and the mini beacon installed.
    Main structure backup lines were installed on all three high racks.
    The last of the ground stake loops were sewn on to the new launch bag.
    A balloon release controller board was soldered together and a hosing make for it.

    We even repaired a broken truss pole on Tandem and stopped to eat pizza and watch ourselves on National Geographic..  Way to go team!
    The team with Away 35, 36 and 37.

  • The Work Goes On

    Now that the fame and celebrity of National Geographic has worn off it’s time to get back to work. The three high racks under construction now structurally complete. We added the outrigger camera diamonds to each last night. The next step is to add the backup rigging lines. This is a line that runs along the carbon poles. If a pole breaks in flight the line keeps the vehicle together.

    Yesterday I ran a cable planning marathon. The new radio has one connector standard, the antenna has a completely different one. The worse part was that an amp that goes between them has a different connector type on each end. Now we’re not talking just male of female. I mean completely different connector styles and standard. On three of the connectors the manufacturers used opposite designation from each other for the same connector. I ended up calling each manufacturer (nine) and getting a photo of each one. After much wrangling I talked two companies into putting different connectors on there equipment. That combined with an adapted and one custom cable and the system has a layout. Now we’ll see what actually comes out of the boxes when they arrive….

    Making data cables
    Making Data Cables

    Working on High Racks
    Working on High Racks

    Inspecting balloon bags
    Inspecting Balloon Bags

  • Our 15 minutes of Fame

    Team JPA will be appearing on the National Geographic Channel. Our moment of fame will be Tuesday 1st April 2008 at 8pm est.

    We are in an episode of “Naked Earth” called “Our Atmosphere”. The show isn’t about us but does have scenes of us working balloons and an interview about the atmosphere.

    Everyone put your VCR’s in record mode!

  • The Team Says “HI”

    A big hello goes out to all our friends attending the Space Conference!!

    teamJPA.jpg

  • Live from the Build

    The gang is all here. Solder is melting and foam board is flying.

    Any questions out there for the team?

  • Today’s List

    Here’s what’s on the todo list for today:

    -Tape GPS Track boxes (3)
    -Finish GPS Track data cables (3)
    -Make GPS Track power cables (3)
    -Determine controller box size
    -Make three controller boxes
    -Inventory 900 Mhz equipment
    -Inspect 3000g balloon bag
    -Test first new controller

  • Results

    The fins look great! These are the anti-roll descent fins for the high racks. Previous fins were foam and only good for one flight. On Away 34 we switched to nylon fins with a carbon leading edge. These worked, but were time consuming to rig in the field. The new fins are also nylon, but have a full carbon frame. They quickly bolt on the vehicle and are reusable.
    It took the rest of the week, but the new flight camera are all modified and tested.

  • Cameras, Controllers and Fins

    I’m getting ready for tonights work session. We’ll be cutting into digital cameras. A little Frankenstein surgery is required to get them to talk to the computer. I tried to do them yesterday, however the eye doctor put drops in my eyes and I couldn’t see the little surface mount components. Those things are REALLY small.

    The high rack fins are also on the menu for tonight. We had them all completed then discover they were all an inch wide and wouldn’t fit on their mounts. Four have been corrected, five to go.

    Time to melt solder. We will be starting on replicating flight controllers. These take about 18 hours each. We’ve get a start on them at least tonight.

  • Decks and Boxes

    Paul and the tomato

    Where else would you find a rocket motor ejector and a sewing tomato being used to construct a low temperture instrument housing?

    This weeks focus has been on structural parts. We been cranking out foam and carbon decks and insulated instrument housing for the Away missions.