Category: Uncategorized

  • Away 35 Progress

    The last system, the laser experiment is just about complete. Today the sensor to array controller interface was built and all the connectors assembled. One more sensor and then on to all the power plugs. It should be all wrapped up tomorrow.

    All of the other new systems are complete, however there is still a lot of packaging to do. On Saturday we conducted the last telemetry range test. It was our best results yet. We’ve declared it good and the current setup will be the flight configuration.

    Here’s the current systems list for Away 35:

    Main command/control telemetry system
    Backup position only telemetry system
    Six ad cameras with controller
    Single horizon still camera with controller
    Tandem motor controller
    Tandem motor sensor array controller (RPM, temperature, voltage)
    Small motor with propeller
    Laser array experiment
    Spot satellite uplink
    Radio beacon
    Balloon release system
    Backup balloon release controller
    200 passive PongSat experiments
    9 computer controlled PongSat experiments
    Stabilizer fins
    Frame
    Foam and carbon decks
    Parachute
    Landing bumper
    Balloon rigging, (line, swivels, d rings, balloon adapter)

  • Radios and Lasers

    The last of the new radio gear arrived for Away 35. Anytime a new piece of hardware goes into the mix it all needs to be retested. We always conduct the range testing in the same place. We “shoot the beam” down the road by the shop that has a tremendous about of radio interference. We walk down the road carrying the system stopping every hundred feet. While we’re doing that the folks in the mission control van are sending commands to the unit and looking at signal strengths.

    It was a good day to be in mission control and a bad day to be walking the road. It was well over 100 degrees and we just melted. Mission control was nice and cool with it’s industrial strength air conditioner.

    Mark and Bob
    Mark and Bob emerging from mission control.

    The laser housings for the Away 35 laser array test arrived. We couldn’t resist firing the lasers up. It’s our own Death Star. Although on the mission they won’t be mount with a rubber band.

    Away 35 lasers

  • Away 35 Nearing Completion

    Last Saturday was another day of bits and boards for Away 35. We modified the main controller’s power harness. We reprogrammed the extra camera controller to take more high altitude pictures and less on the way up. We also reprogrammed the backup balloon release system to take into account the higher altitude Away 35 will reach. After the system was reinstalled on the vehicle we ran a full duration test.

    A duller, but harder and very important was also done. The system shelves were completely gone through and reorganized, (ah the excitement of space).

    We’re about a four days away from systems completion. After that we’ll be running the full up test. Then on to flight.

    Last Saturday the Sacramento L-5 Society Chapter had their monthly meeting at our facility. They had two speakers.  One talked about what’s happening with Lunar exploration and the other (our own Karl) talked about Helium-3 and fusion.

  • Upside Down on Top of the World

    One of our vehicles did a 360 degree roll just after balloon burst. It took this shot while hanging upside down at 106,000 feet.

    JPA Away Mission

  • Out the Window

    This is not a JPA photo, but I would like it to be. This is what I want to see out the window.

    Taken by the Cassini Spacecraft, it shows Alpha Centauri seen from the rings of Saturn. I must go and see that scene with my own eyes.
    Alpha Centauri above the rings of saturn

  • Ascender Pic from 2004

    Ascender 175

    The underside of one arm of the 175 foot Ascender airship.

  • Remember…

    It’s not “No bucks, No Buck Rogers”.

    It’s “No work, No Kirk”.

  • Busy, Busy

    The last week we have were really cranking. Lots of little things that really add up. Here’s the list:

    We’re finally getting a handle on the range issue for the telemetry system. We got a clean doubling of the range last Saturday.

    New insulated housing for the main controller, the sensor controller and addition camera controller were made.

    We’re 80% complete on the new sensor controller.

    Two sensor daughter boards are complete except for waiting for an IC from digikey and two 680k resistors I need to pick up today.

    We built a second antenna stand for our second 900mhz dish antenna.

    The new camera controller is complete. We also converted another fuji camera over to computer control. Last night we tested the camera system. All is good. This week we’ll be conducting the full duration test.

    Bob was VERY excited about the new mission control logging form for the experiments Away 35 will carry, (note heavy sarcasm).

    We reset the transmission rate on the backup GPS telemetry system to every 15 seconds. The new transmitter uses less power and it transmits at higher power. I love high performance gear. The system was transmitting every 30 seconds.

    We found a broken trace on a sensor board on Tandem and repaired it.

    Two older systems got broken down for parts, we use all of the buffalo.

    Plus some mundane tasks that keep it all going; The filters is the dust removal systems were cleaned, a big rack was cleaned out and the far corner of the shop was rearranged to make more room.

    And lastly the Bellavia was taken off the woobley wheels she was on and placed on proper stands.

  • JP on the Space Show Today

    I’ll be on the Space Show radio program today. I’ll be on from 2:00pm till 3:30pm Pacific Time.

    I’ll blog during the show and let you know how it’s going. To listen on the web goto:

    http://www.thespaceshow.com/