  • Flying End Caps

    Anthony gave a shout of “Open the Valve!” as the end began to let go. It was all too fast. The foam and glass end cap went hurling across the shop. Work continues on our gossamer pressure vessels. Solving one problem allows you to push into a new level of problems. Today was no different. We had two solutions to test. A glued seam reinforcement and fiberglass channels in the end caps. For this round we used the six foot straight air beam instead of Ascender test rib.

    The new glue reinforced seam was a big success. The sewn seam alone has big stretch issues above 1.7 psi and starts to fail just above 2 psi. The new seam handled 2.4 psi without any signs of stress. The fiberglass on the end cap channels were still not sure about. The harder surface held up better but was much harder to seal.

    The new issue we discover was the strength, or lack of strength, of the nylon shell end closure. At a touch over 2.4 psi it all let go.

    While we were shooting giant pellets past his head Mark was steadfastly getting pocket sewn for the new launch bag.

    Air beam testing  Air beam testing Air beam testing  Pocket Sewing

  • Christmas End Caps

    I couldn’t resist going to the shop for a little pre-turkey fiberglassing.

    Rib Caps  Rib Caps

    These are the new rib end caps. We’re fiberglassing the channel around the perimeter. This will make a stiffer backing for the rubber seal.  One cap will get high and low volume valves and a pressure gauge. Both will get a smaller foam disk glued to it for stiffness.

    Any bets for 3 psi on Saturday anyone?

  • All the Other Stuff

    We took a break on rib work to catch up on some other projects.

    We nearly completed refurbishing rocket launch box. The last touches included mounting stops on the base of the internal rail, this prevents the rocket from sliding out of the bottom, an important feature, sealing the box, attaching the external support rings and making and gluing on forty foam gussets.

    We sold two of our balloon launch bags. This means it’s time to breakout the sewing machines and make some more! The team cut out the twenty-eight foot fabric panels, ten in all. Next all the panels will be hemmed, then the 240 pocket, all with Velcro closures get made and added then the attachment loops and tear panels…..  If we are sewing our way to space, are we there yet?

    We need to find a adhesive that will bond the silicone/Nylon fabric we use. We bought a set of candidates glues and have begun trials. I wasn’t expecting a success in the first batch. However number five in the first ten passed load under flex test. We’ll be using the adhesive to reinforce a rib seam. Before applying it to a full rib we’ll test it out on a six foot straight air beam. That will also give us a chance to test another upgrade to the rib end caps.

    Box vane supports Glue Testing Stops in the launch box Sewing Away Box Work

  • 2.2 psi Rib

    Saturday we got the rib up to 2.2 psi. At that pressure it supported a 55 pound side load without distorting. I think this rib has told us all it can. The next test rib will incorporate mounts for the leading and trailing edge inflated spars and a few upgrade to the end cap interfaces.

    Ascender Rib Testing

  • New Away 35 Pics

    Mark had these great Away 35 pictures hiding in his camera from last August:

    Away 35 Launch Away 35 Launch Away 35 Launch

    Away 35 Launch Away 35 Launch  Away 35 Team

  • 1.92 psi

    The rib design is evolving nicely. The big advances are coming from the inner cell interfaces. Last Wednesday we had one of the ribs up to 1.6 psi. At this pressure the rib was able to support a 44 pound end load without distorting the ellipse. This is about what we need. Now the task is to get the rib to handle double that to give us a safety margin.

    On Saturday we made two new inner cells and completed the third version of the cell interface. We’ve discovered that the techniques used to put the inner cell into the outer shell have a huge impact on the pressure that can be reached.

    After a long day we were beginning to show real results. At 9pm we went for a full pressure load with all the bells and whistles in place. At 1.7 psi we began hearing loud bangs as banding threads started popping. The banding threads were an idea we tried that didn’t workout so apart from startling us it didn’t matter. We closed all the valves and everything was holding. Back on with the compressor. At 1.92 psi there was a huge pop, a blast of air then just the sound of the compressor. A three foot section of the outer shell had blow out.

    These first test rib outer shells have been simple single seamed creatures. They’ve gone as far as they can go. Now it’s time to build a true double balloon seam and load tape ribs. Although we may do a patch and add some load bands to the existing pair of ribs just to see how high they’ll go. That will give us a better handle on failure modes.

    Cell interface one Cell interface three
    The first and third cell interface.

    Making a new inner cell Mark and inferface two Rib at half pressure

  • Reaching for 2 psi

    With each test the rib changes. We’ve gone from multiple side access panels to drawstring end closures, narrowed the diameter of the inner cell, increased the overall ellipse circumference and a dozen other modifications. For the rib to act as an airbeam we need to get it to 2 psi. Now for the rocket guys that may sound like no pressure at all. For the balloon folks that is a huge number. The current configurations have gotten us just over 1 psi. Still a long, long way to go.

    In the last couple of days we’ve been building ridged end caps and a new fill and gauge interface. We’ll be reaching for the magic 2 psi tonight.

    Here’s some images from last Saturdays work session:

    Rib testing Emmett and the rib
    Paul and Emmett working on a rib.

    Bob Making Parts Reel testing
    Bob and Anthony working on the reel.

  • Second Ascender 100 Rib Test Pics

    Inflation, inner cell making and testing and rib fitting.

    Beginning inflation The big blue worm After 20 mins of inflation Inner cell construction Inner cell testing Inside rib fitting
    Inside rib fitting Inside rib fitting Inside rib fitting Inside rib fitting Inside rib fitting

  • Ascender Rib Fit Test 2

    Last weekend we again had one of the Ascender 100 arms inflated in the parking lot. We were going to test both the original rib that had been extended and a new rib. During the initial inflation there was a POP! The inner cell of the original rib burst. We continued with the tests of the new rib. This rib design was significantly better that the first one. The test also pointed out a number of flaws in the design we well as a couple of operational problems. No problem through, that is what the test was for. The next generation of rib is being designed. I suspect we’ll need eight to nine generation to really hone it in. We’re also working on new filling gear with new low pressure gauges. We need also to monitor the ambient pressure inside the main envelope in addition to pressure inside the rib. It’s way too easy to over pressure the outer envelope and creating forces to great for the rib to overcome.

    The team really put in a hard days work on this one.

    Here’s some pics from the Wednesday night build session before the test:

    Inside the rocket launch box front Inside the rocket launch box back foiling the Launch Box 2
    Inside the launch box after we finished foil lining the foam.

    Original rib modified
    The modified original rib.