Today we got the system for measuring the speed of the wave in the shock tube working. We will be able to measure speed in the tube up to Mach 3. The chart is from a test run of the instrumentation. It wasn’t measuring waves but rather me smacking it with a pen. Tomorrow it gets installed in the tube.
Author: Administrator
-
MiniCube Flights on Sale!
MiniCubes are small payload containers that ride to the edge of space on balloon. Normally $320, they are on Sale this month for $270.
Price include a MiniCube and a flight. Flights available April 26th and September 27th 2014.
-
Exploring the Magnetic Field During the MHD Process
Julian, our amazing intern, assemble this pair of high resolution electrodes for the MHD program. Instead of solid plates each electrode is an array of wires. Each wire is connected to the datalogger sampling 200 times a second. This way we can compare the exact power output in relation to the magnetic field. We can then go back an optimize the solid electrodes.
-
Ascender 26 CAD Drawings
I’ve been finishing up the CAD drawing of Ascender 26. The interior drawing aren’t complete yet but the outside is looking good. This shows the Ascender 26 in it’s first short flight to 1000 feet configuration.
-
Spaceship building Practice
Yesterday we got a lot of spaceship building practice in. Musicians practice there violins before a concert right? However there are few opportunities for spaceship building practice. At JPA we use submarine building for a spaceship building practice. Yesterday we cut the recesses for the fore and aft ballast tank port frames. Its rather like notching the hole in the wall to fit the door frame.
We got all four port frames recessed.
-
MHD Tests 96 and 97
We conducted two MHD tests last night. First first produced no data. We had conducted a dry test before the firing. A dry test is when we run the data logger on the fully prepared system however the motor is not fired. Instead a battery is connected to the plates. We check the and if you see the batter voltage you know the system is ready. The dry test was successful but there was no data from the live firing. While disassembling the system we discovered that the ground wire on the data cable had broken. It was apparently hanging on by a single strand during the dry test and came off when the test rig was rolled out to the parking lot.
On second second run it unit just plain old wouldn’t fire. After four hours of epic ninja battles with the test gear we got a good test. Sometimes your gear just gets old. This was firing 97. I’m just glad everything starting failing all at once rather then put us in agony for weeks.