Here’s the list for today’s build session:
-Mount handles on crew module mockup, (six handles mounted on the exterior so we can lift the thing).
-Assemble the propeller popper, (upgraded backup balloon separation circuit use the Parallax Propeller chip).
-Join launch bag panels, (each of the 28 foot panels need to be sewn to each other).
-Assemble 3 backup trackers, (we’re rebuilding all of out backup tracking telemetry systems).