Saturday was a day of sewing, circuits and foam cutting. We need a little more power output from the new propeller driven balloon release (propeller as in the chip). Mike spent the day bread boarding the modification circuit. Paul was busy at the sewing machine creating a wider tear panel for our small balloon bag. The balloon bag is just the right size for sea level launches but too small for launches the 4000 foot Black Rock lake bed. The wider tear panel will add just the right amount of room. Ethan our evil intern wrestled with triangles all day making antenna mounts for the next set of vehicles (the triangles almost had him, but he won out in the end).