Work on the Ellipse Airship Continues
The team spent the morning working on the Ellipse airship. We reinstalled the air beam structure inside the outer envelope.




This entry was posted on Sunday, May 21st, 2023 at 4:43 pm and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed.
Both comments and pings are currently closed.