High Rack assembly continued on Saturday. The team mounted the main decks to the carbon frames and assembled sets of the small top decks. We’re also preparing a rockoon mission. That mission is further along and in the code debugging stage.
This entry was posted on Monday, March 7th, 2011 at 6:43 am and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed.
Both comments and pings are currently closed.